MIRBEAU INN & SPA

Rhinebeck, NY

Mirbeau Inn & Spa

Capitalizing on the scenic beauty and ideal location of New York’s Hudson Valley, the Mirbeau Companies opened the 76,000 SF Mirbeau Inn & Spa in Rhinebeck, NY, in September 2019. PC Construction managed the project, and selected Advance Testing to provide comprehensive special inspection and materials testing services throughout construction, from groundbreaking in March 2018 through the grand opening. The Inn, which is situated on 2.5 acres, has 50 guest rooms, each with its own fireplace, walk-in shower and claw-foot tub. The Inn also features 3,000 SF of meeting rooms, conference space, a Bistro and Wine Bar, as well as a restaurant managed by world-renown chef Charlie Palmer. Mirbeau’s 12,000 SF Spa wing and fitness center has its own entrance, cedar-shingled roof, and 14 treatment rooms, each with a fireplace and sound system. The facility also includes a thermal pool, steam room, Himalayan salt saunas and a year-round aqua terrace.

Parking at Mirbeau includes an underground facility with 48 spaces, as well as 44 outdoor spots. The facility is located two miles from the Rhinecliff-Kingston Train Station, servicing the Amtrak Northeast Corridor line, and is also within driving distance of New York City and Albany.

Among the services provided by Advance Testing for the Mirbeau project were: soil compaction testing, bearing capacity inspection, reinforcing steel inspection, concrete testing, anchor bolt inspection, structural steel inspection, fireproofing inspection, and wood framing inspection.

Client: PC Construction

Additional Project Photos

PROJECT INFORMATION FORM

Do you need help with a project? Fill out this form to get in touch.

CALL US

845.496.1600

OFFICE HOURS

7:00am – 5:00pm

Advance Testing’s services are available 24 hours a day, 7 days a week, 365 days a year.