CPV VALLEY ENERGY CENTER
Waywayanda, NY
CPV Valley Energy Center
CPV Valley Energy Center is a natural gas combined-cycle electric power generator located in the town of Waywayanda, capable of generating 680 MW. The project is sited on a 122-acre parcel in close proximity to Interstate 84. This facility can produce enough electricity to power more than 650,000 homes, helping to meet the demand for local, reliable power in the Hudson Valley. The facility utilizes advanced air-cooling which reduces water use approximately 85% compared to traditional facilities.
After a lengthy eight-year review and approval process, the project commenced with a total construction timeline of thirty months. The project included 200,000 yd3 of fill and 20,000 yd3 of concrete as well as a large quantity of steel and welding inspection. Advance Testing’s scope of services included soil compaction testing, asphalt field inspection and testing, reinforcing steel inspection, concrete testing, structural steel inspection, bolting inspection, non-destructive testing of welds (UT/MT/PT) and inventory management of welding rods for the contractor.
Client: Skanska, Burns & McDonnell, ECCO III, JV
SERVICES PROVIDED
Soil Compaction Testing
Bearing Capacity Inspection
Asphalt Field Testing & Inspection
Reinforcing Steel Inspection
Concrete Testing & Inspection
Bolting Inspection
Welding Inspection
Magnetic Particle Weld Testing
Dye Penetrant Weld Testing
Ultrasonic Weld Testing
Laboratory Testing
Building Code Special Inspections
LOCATION
Waywayanda, NY
GET IN TOUCH
Office: 845.496.1600
Additional Project Photos
CALL US
845.496.1600
OFFICE HOURS
7:00am – 5:00pm