Advance Testing worked as a sub-consultant to HNTB as part of the Owner’s Engineer team, tasked with providing oversight of all activities during construction of the $3.9 billion Mario M. Cuomo Bridge. The new bridges cross the Hudson River between Westchester and Rockland Counties, and provided a completed replacement for the old Tappan Zee Bridge. At the time of construction, the project was New York State’s largest design-build project, and also one of the largest transportation infrastructure projects in North America. The project entailed the construction of two new 3.1-mile cable-stayed spans built to the north of the existing bridge. Advance Testing’s role was to provide a wide variety of materials testing and inspection oversight services, as well as the design, outfitting and operation of an on-site AASHTO-accredited laboratory. Inspection oversight and materials testing work was conducted both on site, as well as in fabrication / production facilities throughout the United States.
Client: HNTB Corporation
SERVICES PROVIDED
- Soil Compaction Testing
- Asphalt Testing & Inspection Oversight
- Concrete Testing
- Precast Concrete Plant Fabrication Inspection Oversight (Off-Site)
- Masonry & Grout Testing
- Steel Fabrication Inspection Oversight (Off-site)
- Welding Inspection Oversight
- Magnetic Particle Testing
- Ultrasonic Weld Testing
- Laboratory Testing
- Building Code Special Inspections Oversight
LOCATION
Westchester/Rockland Counties, NY
GET IN TOUCH
Office: 845.496.1600
Additional Project Photos
CALL US
845.496.1600
OFFICE HOURS
7:00am – 5:00pm
Advance Testing’s services are available 24 hours a day, 7 days a week, 365 days a year.
CALL US
845.496.1600
OFFICE HOURS
7:00am – 5:00pm
Advance Testing’s services are available 24 hours a day, 7 days a week, 365 days a year.